Reaction columns are disposed at 30° from soil in order to make loading procedures more easy.
Frontal protection panel moved with pneumatic command assure the best safety garrison for the operator during the test.
Option for Control valve process asset is available to offer a complete solution for CV setting up & repair.
In the basement, a water tank is installed as water reservoir for test procedures.
Test process is controlled by electronic PLC & LCD touch screen. Test data can be printed out on 24cln thermal printer directly in test area or be downloaded by serial connection (standard) to Windows based PC with TestREC3.0 certification software. Complete flow meters set could be installed (See option) to perform Seat leakage test on control valves.